What are the technical screening criteria (TSC) for hybrid/ blended projects such as: Hydrogen storage facility which stores hydrogen from a blend/mix of different sources, how could the operator track and evidence this?
If a hydrogen storage facility receives hydrogen from multiple sources with varying carbon intensities, it is recommended that the operator adopt a robust tracking system. This system should document the volume and carbon intensity of hydrogen from each source. This could involve: Supply Contracts: Contracts with hydrogen producers specifying the carbon intensity of their hydrogen. […]
For steel, we understand that the SAT criteria are aligned with the CBI criteria. The CBI distinguishes between criteria for new and existing steel plants based on a 2022 cutoff, but the SAT does not seem to take the same approach. Could SAT provide clarification on this?
Yes, the methodologies for SAT are based on CBI, and it is also mentioned to have a reduction in impact percentage between 2022 and 2030 by decarbonisation efforts. [Updated in Dec 2025]