CCS is not compulsory, especially when the plant meets the threshold. Further, per part 1 (see below), this is an optionality criteria provided.
Part 1
Qn: Does ‘The activity meets the following criteria’ mean that it needs to meet all of the following criteria or just one of the following criteria?
The activity would have to meet all criteria (except for CCS, where it’s an additional optionality provided), as these criteria are all interconnected. For example, the second and third criteria relate to the certification standard required to be observed for the calculation of the first criterion.
[Updated in Dec 2025]